Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

CMU WILL_C

10 unique locations - 37.0MW total capacity

BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (8 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
P & C Attfield Lodge Farm Countesthorpe Road Whetstone, Leicestershire LE8 6LD (4 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (5 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2025-26 (T-4), 2023-24 (T-1) ...
5.79 MW
UNITS A, B, C & D POSTLEY ROAD KEMPSTON BEDFORD MK42 7AG (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam … (2)
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations