Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WILL_C

22 unique locations - 1377.0MW total capacity

BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
204.00 MW
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (15 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1105.23 MW
Cottam EDF Energy (Cottam Power) Ltd, Outgang Lane, Cottam, Retford, DN22 0NP (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
442.31 MW
HOLTS GREEN GREAT BRICKHILL MILTON KEYNES MK17 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
21.60 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
33.22 MW
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (4 components)
• 10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 10 locations