Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WESTON

151 unique locations - 24771.2MW total capacity

Ardagh Glass, Portland Place, Irvine KA12 8JA (16 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build battery
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.19 MW
Asda Bristol CDC Distribution Centre, St Andrews Road, Kings Weston Lane BS11 9FG (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASHBOURNE DRIVE WESTON CREWE CHESHIRE CW2 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Avon Close, Weston-Super-Mare, BS23 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
BARNES MEADOW UPLYME LYME REGIS DORSET DT7 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
BEACH ROAD KEWSTOKE WESTON-SUPER-MARE BS22 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BEACH ROAD, KEWSTOKE, WESTON-SUPER-MARE, BS22 (21 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
BERKELEY CRESCENT UPHILL WESTON-SUPER-MARE BS23 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BLACKBURN WAY WEST WICK WESTON-SUPER-MARE BS24 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BLENHEIM COTTAGES BLENHEIM LANE LITTLE MILTON OXFORD OX44 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
25.20 MW
Loading map...
Showing 10 locations