Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WARR19

2 unique locations - 15.0MW total capacity

Crossdykes Wind Farm, Langholm, Lockerbie, DG11 2QL (18 components)
• 23.000MW of Wind Generation
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
5.66 MW
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (11 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
164.65 MW
Loading map...
Showing 2 locations