1 unique locations - 1.9MW total capacity

Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (6 components)
β€’ A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station. (2)
β€’ A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Active β€’ 2024-25 (T-1), 2024-25 (T-4) ...
11.94 MW