Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SP_CMU

19 unique locations - 2.8MW total capacity

West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Uppingham STW, Sewage Treatment Works, Seaton Road, Uppingham, OAKHAM Leicestershire, LE15 9TX (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Stanbridgeford STW, STANBRIDGEFORD STW, A505 Bypass, Stranfordbridge, LEIGHTON BUZZARD Bedfordshire, LU7 9JG, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Ravensthorpe WTW, RAVENSTHORPE WW, Teeton Road, Ravensthorpe, NORTHAMPTON, NN6 8EJ, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Pitsford WW, PITSFORD WW, Grange Lane, Pitsford, NORTHAMPTON, NN6 9AP, (6 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
OLD STRATFORD WB, OLD STRATFORD WB, Crosgrove Road, Old Stratford, MILTON KEYNES, MK19 6BB, (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Northampton River SP, Northampton-Riverside Museum Way, Fairground Way, Riverside Business Park, NORTHAMPTON, NN3 9HU, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (7 components)
• New build gas generator
• The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
LAND ON THE NORTH SIDE OF SMEATON CLOSE AYLESBURY HP19 8UW (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2021-22 (T-1) ...
3.80 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
49.98 MW
Loading map...
Showing 10 locations