CMU SP_CMU

8 unique locations - 2.8MW total capacity

Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
21.29 MW
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
18.48 MW
LAND ON THE NORTH SIDE OF SMEATON CLOSE AYLESBURY HP19 8UW (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2021-22 (T-1) ...
3.80 MW
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DE (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.38 MW
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.64 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)
• Component has yet to be procured.
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2028-29 (T-4), 2022-23 (T-4) ...
17.74 MW
10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2021-22 (T-1)