CMU SELBY_

4 unique locations - 18.9MW total capacity

Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1820.10 MW
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready … (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
7.16 MW
Loading map...
Showing 4 locations