Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

5 unique locations - 18.9MW total capacity

Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (41 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2527.80 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (68 components)
• Pembroke 11 - CCGT
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (54 components)
• Staythorpe 1 - CCGT
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
Loading map...
Showing 5 locations