Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

CMU SAND-1

27 unique locations - 176.4MW total capacity

Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WILKIE COURT WOBURN SANDS MILTON KEYNES MK17 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WEATHERCOCK LANE WOBURN SANDS MILTON KEYNES BUCKINGHAMSHIRE MK17 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
The Crescent, Grange-Over-Sands, Cumbria, LA11 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
STONEBECK LINDALE GRANGE-OVER-SANDS CUMBRIA LA11 (2 components)

EV charging at residential premises (2)

Active • 2024-25 (T-1), 2023-24 (T-1)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (6 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (14 components)
• One of four SURF (Aggreko) model CHP units rated at 1375kVA (2)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (14 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Scroby Sands Wind Farm, Admiralty Road, Great Yarmouth, NR30 3NS (3 components)

Offshore wind farm

Active • 2028-29 (T-4)
17.37 MW
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
Loading map...
Showing 10 locations