CMU S24G01

2 unique locations - 37.8MW total capacity

Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)
β€’ (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
β€’ (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
β€’ (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
794.87 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (2 components)
β€’ (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
β€’ (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Sembcorp Utilities (UK) Limited Existing Generating CMU
Inactive β€’ 2017-18 (T-1)
Loading map...