CMU S22GT3

1 unique locations - 44.9MW total capacity

Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (25 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
Loading map...
Showing 1 locations