CMU PPKM24

3 unique locations - 4.0MW total capacity

Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.32 MW