Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU PPBB23

1 unique locations - 6.0MW total capacity

Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (5 components)
β€’ The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
β€’ The CMU is an electro-chemical battery storage system connected to the transmission system at the NationalΒ Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
39.48 MW
Loading map...
Showing 1 locations