Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU MEDWAY

17 unique locations - 19.0MW total capacity

2 Parsonage Lane, Rochester, Kent, ME2 4UR (2 components)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Inactive • 2021-22 (T-4)
FERRIER MEDWAY EDINBURGH MIDLOTHIAN EH17 (21 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
265.47 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Geraldine Way Castle Donington DE74 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.00 MW
LOCK LANE LONG EATON NOTTINGHAM NG10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.26 MW
MAINGAIT MEDWAY NEWCRAIGHALL EH21 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.70 MW
MAINGAIT MEDWAY, NEWCRAIGHALL, EH21 (9 components)

EV charging on residential premises

Active • 2025-26 (T-4), 2023-24 (T-1) ...
75.85 MW
MEDWAY CRESCENT ALTRINCHAM CHESHIRE WA14 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
37.92 MW
MEDWAY DRIVE HORWICH BOLTON LANCASHIRE BL6 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
132.73 MW
Loading map...
Showing 10 locations