CMU MAIN17

2 unique locations - 4.9MW total capacity

Main Site Energy Centre, Main Road, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR (15 components)
β€’ The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 4.981MW and additional PSEUDO MPAN's are fitted.
β€’ The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
β€’ The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...