Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU LOCHAY

4 unique locations - 39.9MW total capacity

The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (2 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (5 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Single combined cycle gas turbine with supplementary firing
Active • 2024-25 (T-4), 2022-23 (T-3) ...
369.00 MW
BESTWOOD QUARRY, NOTTINGHAM ROAD A60, NOTTINGHAM, NOTTINGHAMSHIRE, NG15 8FL (7 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage).
• DSR Component providing load turn down at a manufacturing site
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 4 locations