Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU LEVC01

720 unique locations - 8.2MW total capacity

CH6 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
116.14 MW
CH61 (12 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
156.46 MW
CH62 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
159.54 MW
CH63 (27 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
154.29 MW
CH64 (16 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
203.79 MW
CH7 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
338.91 MW
CM11 (20 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
128.74 MW
CM18 (7 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-1)
79.68 MW
CM2 (53 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
301.71 MW
CM3 (65 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2028-29 (T-4), 2025-26 (T-4) ...
396.89 MW
Loading map...
Showing 10 locations