CMU KPDR10

2 unique locations - 19.4MW total capacity

Sheepbridge Lane, Sheepbridge, Chesterfield, S41 9RX (6 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Diesel and/or gas reciprocating engines.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
To be determined (93 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Loading map...