Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU KPDR03

2 unique locations - 9.7MW total capacity

Northmoor Lane, Cottingham, Hull HU16 4JN (5 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2027-28 (T-4), 2023-24 (T-1) ...
6.94 MW
To be determined (102 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Loading map...
Showing 2 locations