Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU KIWI75

4 unique locations - 30.0MW total capacity

To be determined (102 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Land North of Thame Lane, Culham, Abingdon, Oxfordshire, OX14 3GY (5 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering at the grid connection point. The detailed co-ordinates 'TQ 62205 76671' or what3words 'twist.launch.novel' will take you to an image of the site (in Google Maps you can see the storage system itself in the photo).
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2027-28 (T-4), 2022-23 (T-3) ...
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 4 locations