Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU HPGL19

3 unique locations - 3.8MW total capacity

Harworth Colliery, Harworth Park Industrial Estate, Scrooby Road, Harworth, Doncaster, South Yorkshire, DN11 8AB. (9 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 3 x Jenbacher 420 (1.4MW)
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.89 MW
Kellingley Colliery Turvers Lane, Knottingley, West Yorkshire, WF11 8DT. (7 components)
• 5 x Jenbacher 420 (1.4MW)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Stillingfleet Colliery Cawood Road, Stillingfleet Moor, Stillingfleet, Yorkshire, YO19 6HS (5 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• New build battery
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Loading map...
Showing 3 locations