CMU GBD027

8 unique locations - 4.0MW total capacity

100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Active • 2028-29 (T-4), 2027-28 (T-4) ...
47.16 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (13 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1763.05 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)
• Gas fired CHP unit
• Ratcliffe Unit 2 coal-fired unit
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.45 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.22 MW
Yearsley - Wisbech, Weasenham La, Wisbech, PE13 2RN (12 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is an existing CHP
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.20 MW
Yeasrley - Bellshill, Belgowan Street, Bellshill ML4 3LB, UK (19 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW
Loading map...