CMU Finwy3

2 unique locations - 4.8MW total capacity

Liverton Business Park, Exmouth, Devon EX8 2NU (4 components)
• A gas fuelled generating station.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
11.42 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (6 components)
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
• New Build CMU comprising of battery storage and associated plant
• This is an existing CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.76 MW