CMU FLXT75

10 unique locations - 17.4MW total capacity

Combe Park, Bath, BA1 3NG (4 components)
• Standby generation taking site load
• Standby generation x 2
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
entre Bailey Road, Central Park, Rugby CV23 0PD (3 components)
• Load curtailment & standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
21.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (10 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Load curtailment at site with standby generation exporting
Active • 2028-29 (T-4), 2027-28 (T-4) ...
66.48 MW
Kings Park Road, Moulton Park, Northampton, NN3 6NW (4 components)
• Load curtailment on site and standby generation
• Load reduction on site via standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Monument Road, Bicker, Lincolnshire PE20 3DJ (4 components)
• Load curtailment and standby generation
• Load curtailment at site via standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Pipers Way, Swindon, Wiltshire, SN38 1SN (4 components)
• Load curtailment & standby generation
• Load reduction via on-site standby generation taking site load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Portsmouth Rd, Frimley, Surrey GU16 7UJ (5 components)
• Standby generation sub-metered taking site load (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (5 components)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
• Standby generation sub-metered taking site load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
53.78 MW
Pudding Lane Spalding, Lincs, PE11 3TJ (5 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Pudding Lane Spalding, Lincs, PE11 3TJ (5 components)
• Load curtailment and standby generation
• Load curtailment via standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
60.25 MW
Loading map...
Showing 10 locations