Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU FLXT75

17 unique locations - 17.4MW total capacity

125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (4 components)
β€’ Load curtailment via standby generation exporting excess
β€’ Load reduction on-site and standby generation
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Broom Road, Stone ST15 0TE (4 components)
β€’ Load curtailment
β€’ Load reduction
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Cairnton Road, Boyndie, Banffshire, AB45 2LR (6 components)
β€’ Standby diesel generator that reduces site load when generating.
β€’ Standby generation
β€’ Standby generation from a POSGU.
DSR FLEXITRICITY LIMITED Unproven DSR CMU
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
27.73 MW
Combe Park, Bath, BA1 3NG (4 components)
β€’ Standby generation taking site load
β€’ Standby generation x 2
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
entre Bailey Road, Central Park, Rugby CV23 0PD (3 components)
β€’ Load curtailment & standby generation
β€’ Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
21.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (10 components)
β€’ A standby diesel generator on a waste water treatment works.
β€’ A standby diesel generator on a waster water treatment works.
β€’ Load curtailment at site with standby generation exporting
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
66.48 MW
Kings Park Road, Moulton Park, Northampton, NN3 6NW (4 components)
β€’ Load curtailment on site and standby generation
β€’ Load reduction on site via standby generation
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Lyndon, West Bromwich, West Midlands B71 4HJ (4 components)
β€’ Load curtailment on site via standby generation
β€’ Standby generation supporting load curtailment
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Monument Road, Bicker, Lincolnshire PE20 3DJ (4 components)
β€’ Load curtailment and standby generation
β€’ Load curtailment at site via standby generation
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Pipers Way, Swindon, Wiltshire, SN38 1SN (4 components)
β€’ Load curtailment & standby generation
β€’ Load reduction via on-site standby generation taking site load
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
50.75 MW
Loading map...
Showing 10 locations