Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU FLXT75

18 unique locations - 17.4MW total capacity

125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (4 components)
• Load curtailment via standby generation exporting excess (2)
• Load reduction on-site and standby generation
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Broom Road, Stone ST15 0TE (4 components)
• Load curtailment (2)
• Load reduction
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Bush Estate Penicuik EH26 0QA (11 components)

Mixture of load reduction and standby generation. (2)

DSR FLEXITRICITY LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cairnton Road, Boyndie, Banffshire, AB45 2LR (6 components)
• Standby diesel generator that reduces site load when generating. (2)
• Standby generation
DSR FLEXITRICITY LIMITED Unproven DSR CMU
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Combe Park, Bath, BA1 3NG (4 components)
• Standby generation taking site load (2)
• Standby generation x 2
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
entre Bailey Road, Central Park, Rugby CV23 0PD (3 components)
• Load curtailment & standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
• A standby diesel generator on a waste water treatment works. (2)
• A standby diesel generator on a waster water treatment works.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (2 components)

Standby generation (2)

FLEXITRICITY LIMITED Unproven DSR CMU
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Kings Park Road, Moulton Park, Northampton, NN3 6NW (4 components)
• Load reduction on site via standby generation (2)
• Load curtailment on site and standby generation
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lyndon, West Bromwich, West Midlands B71 4HJ (4 components)
• Load curtailment on site via standby generation (2)
• Standby generation supporting load curtailment
DSR FLEXITRICITY LIMITED Proven DSR CMU
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 10 locations