Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU FLXT01

2 unique locations - 8.1MW total capacity

Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
High Street Waterham Kent ME13 9EJ (4 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Inactive • 2017-18 (T-1)
Loading map...
Showing 2 locations