Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU F24091

5 unique locations - 8.4MW total capacity

Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)
• Aggregate CMU from Multiple Sources
• Front of the Meter battery storage asset located in Devon.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.79 MW
Asda South Shields, Coronation Street NE33 1AZ (8 components)
• Generating Unit 2
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
23.52 MW
Asda Rawtenstall, Lower Mill St. Mary's Way BB4 8EL (7 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.98 MW
Asda Keighley, Bingley Street BD21 3ER (8 components)
• Existing CCGT unit
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
23.52 MW
Asda Chelmsley Wood, 341 Bosworth Drive Chelmsley Wood B37 5EX (7 components)
• 1 x hydro turbine & synchronous generator
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
23.52 MW
Loading map...
Showing 5 locations