Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU F21080

17 unique locations - 5.3MW total capacity

Asda Norwich, Drayton High Road, Hellesdon, NR6 5DT (12 components)
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Load curtailment from refridgeration
• Load reduction from refrigeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Asda Redhouse Warehouse Doncaster, Redhouse Interchange, Adwick-Le-Street, DN6 7FB (13 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Asda Rochdale CDC Goods in, John Milne Ave, Rochdale OL16 4NR (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Asda Skelmersdale CDC, 6 Firswood Rd, Lathom, Skelmersdale WN8 8UT (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Asda Wakefield Chilled Distribution Centre (CDC), Tuscany Park Express Way WF10 5UA (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
New Bankside, Abbots Wynd FK2 7XP (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
Tuscany Park Express Way WF10 5UA (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 7 locations