CMU END030

34 unique locations - 9.1MW total capacity

MMDSS - Site 6, Flathouse Quay, Portsmouth PO2 7SP (11 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-1) ...
21.63 MW
MMDSS - Site 7, Flathouse Quay, Portsmouth PO2 7SP (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.45 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (19 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
7.42 MW
TH Clements, W End Road, Benington, Boston, PE22 0EJ (11 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 4 locations