CMU END030

2 unique locations - 9.1MW total capacity

Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Component has yet to be procured
Active • 2026-27 (T-4), 2023-24 (T-1) ...
17.36 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (19 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
7.42 MW
Loading map...
Showing 2 locations