Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU EL0047

2 unique locations - 4.0MW total capacity

Land at Traston Road, Newport, NP19 4PW (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Active β€’ 2025-26 (T-4), 2022-23 (T-4)
Land at Traston Road, Newport NP19 4PW (2 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport
β€’ The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active β€’ 2025-26 (T-4), 2022-23 (T-4)
Loading map...
Showing 2 locations