CMU EL0018

2 unique locations - 0.6MW total capacity

Plot C, Land at Severn Road Avonmouth BS10 7SE (7 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
27.31 MW
Plot C Land at Severn Road Avonmouth BS10 7SE (7 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
27.31 MW
Loading map...
Showing 2 locations