Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU EGOCGT

2 unique locations - 284.7MW total capacity

Plot A Land at Waterswallows Road, Buxton, SK17 7JT (4 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
16.00 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (6 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.48 MW
Loading map...
Showing 2 locations