Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU DSRP07

20 unique locations - 2.6MW total capacity

Banwell, , Banwell, BS29 6NY (17 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BW007, Oldford High Lift, Oldford Highlift Pumping Station, Oldford Hi Resevoir, Iron Mill Lane, BA11 2ND (18 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BW016, Chew Magna, Winford Road, Chew Magna, Bs18, BS40 8QQ (16 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BW020, Dryhill, Queens Avenue, Portishead, Bs20, BS20 6NG (16 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.96 MW
BWW004, Egford Main, Egford Hill, Frome, BA11 3JJ (15 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BWW006, Oldford Borehole, Oldford Borehole, Lullington Lane, Frome, BA11 2NF (18 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BWW010, Axbridge, Cheddar Road, Cheddar, Axbridge, BS26 2DL (17 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BWW011, Barrow, Barrow Gurney Pump, Barrow Gurney, Bristol, BS48 3SH (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BWW013, Blagdon, Station Road, Blagdon, Bristol, BS40 7UN (19 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
BWW014, Cheddar T.W, Lower New Road, Cheddar, Bs27, BS27 3DY (18 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.31 MW
Loading map...
Showing 10 locations