CMU DSRCL1

2 unique locations - 16.9MW total capacity

Land at Claredown Farm, Hickford Hill, Belchamp St Paul, Sudbury, Essex, CO10 7DW (6 components)
β€’ 20 MW of DSR
β€’ 20MW Battery Storage Facility located in Sudbury, Essex.
β€’ 3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
42.65 MW
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (3 components)
β€’ 20 MW of DSR
β€’ 20 MW of demand reduction
β€’ 20MW Battery Storage Facility located in Sudbury, Essex.
DSR Storage BESS Claredown Limited New Build Generating CMU
Inactive β€’ 2020-21 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 2 locations