CMU DSR048

2 unique locations - 1.7MW total capacity

Land at Fordbridge Lane, Blackwell, DE55 5JY (3 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
To be confirmed once CMU components are known (98 components)

To be confirmed once CMU components are known

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
190.46 MW
Loading map...
Showing 2 locations