Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU DR2522

47 unique locations - 1105.2MW total capacity

Unit 6, Factory Road, Standard Industrial Estate, Silvertown, E16 2EJ (1 component)

The CMU component reduces demand

Active • 2025-26 (T-4)
MBA Polymers - Worksop, Sandy Ln, Worksop , S80 3ET (17 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-4) ...
25.84 MW
Kings Inch Drive, KING GEORGE V DOCK, KINGS INCH ROAD, GLASGOW, Lanarkshire, G51 4SD (1 component)

The CMU component reduces demand

Active • 2025-26 (T-4)
EMR Willesden, 106 Scrubs Ln, London , NW10 6QY (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
39.67 MW
EMR Wandsworth, Private Sidings, Pensbury Pl, Nine Elms, London , SW8 4TR (12 components)
• New Gas fulled generation station
• Standby generation
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
17.22 MW
EMR Swindon, Bridge House, Gipsy Lane, Swindon, SN2 8DZ (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.61 MW
EMR Swindon, Bridge House, Gipsy Lane, Swindon , SN2 8DZ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.45 MW
EMR Southampton, Princes Street, Southampton, SO14 5AP (10 components)
• A gas fuelled generating station.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
17.22 MW
EMR Smethwick, Downing Street, Smethwick, West Midlands , B66 2PG (25 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.28 MW
EMR Shoreham, Kingston Wharf, Brighton Road, Shoreham, BN43 6RN (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-4) ...
18.77 MW
Loading map...
Showing 10 locations