CMU Castle

1 unique locations - 3.4MW total capacity

Rockingham South, Smoke Lane, Avonmouth, BS11 0YT (3 components)
β€’ 2 x 2 MW OCGT gas reciprocating engine
β€’ 5 x 2MW OCGT gas reciprocating engine
β€’ The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 other CMU's (all owned by Enersyst Limited). The total capacity of all of the CMUS's to be connected to the grid connection point will total 30 MW in line with the accepted grid connection offers.
Inactive β€’ 2022-23 (T-4), 2020-21 (T-4)
Loading map...