CMU Castle

12 unique locations - 3.4MW total capacity

Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (6 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
6.35 MW
Harmire Road, Barnard Castle, County Durham, DL12 8DT (22 components)
• Component has yet to be procured.
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land north west of Gilston Farm, Heriot, Scottish Borders, EH37 5TF (3 components)
• N/A
• New build onshore wind farm.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (16 components)
• A gas engine CHP site providing hot water to an industrial unit
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.57 MW
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND (6 components)
• New build wind farm at Aberarder consisting of 12 wind turbines.
• load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
8.29 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.22 MW
Loading map...
Showing 10 locations