Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU Castle

5 unique locations - 3.4MW total capacity

Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (5 components)
• Load reduction on site supported by non-exporting standby generation.
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.00 MW
West Thorpe, Willoughby on the Wolds, LE12 6TD (14 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT (2 components)
• 2 x 2 MW OCGT gas reciprocating engine
• 5 x 2MW OCGT gas reciprocating engine
Inactive • 2020-21 (T-4)
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
6.35 MW
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (6 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 5 locations