CMU COWLEY

10 unique locations - 8.9MW total capacity

COWLEY GREEN WOMBWELL BARNSLEY S73 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
97.74 MW
Cowley Hill Borehamwood Hertfordshire WD6 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
97.74 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
COWLEY MEADOW WAY CRICK NORTHAMPTONSHIRE NN6 (20 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
159.93 MW
COWLEY ROAD UXBRIDGE MIDDLESEX UB8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
97.74 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.50 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.38 MW
Houghton Main CMU Generation Plant, Park Spring Road, S Grimethorpe, S72 0HN (8 components)
• Gas reciprocating engines
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.04 MW
Tyndale House Unit 2/5 134A Cowley Road Oxfordshire Great Britain OX4 1JE (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
8.89 MW
WINSTANLEY LANE SHENLEY LODGE MILTON KEYNES MK5 (28 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
68.40 MW
Loading map...
Showing 10 locations