CMU CK_241

2 unique locations - 12.9MW total capacity

High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (3 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active β€’ 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
Loading map...