CMU CK_234

2 unique locations - 6.6MW total capacity

High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (1 component)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active β€’ 2025-26 (T-1)
12.90 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (2 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active β€’ 2027-28 (T-4), 2025-26 (T-1)
19.47 MW
Loading map...
Showing 2 locations