CMU AXP600

737 unique locations - 148284.1MW total capacity

NR4 (36 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
94.30 MW
NR34 (19 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
202.25 MW
NR33 (18 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
219.77 MW
NR2 (7 components)

Domestic EV charger

DSR AXLE ENERGY LIMITED Proven DSR CMU
Active β€’ 2025-26 (T-1)
4.55 MW
NR19 (8 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
77.08 MW
NR18 (32 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
314.91 MW
NR14 (44 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
438.00 MW
NR13 (33 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
243.47 MW
NP7 (24 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR ATTUNE POWER LTD Proven DSR CMU Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1)
52.12 MW
NP44 (24 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
275.95 MW