CMU AXP400

50 unique locations - 6624.4MW total capacity

NE3 (54 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
115.91 MW
NN6 (84 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
220.58 MW
NP7 (57 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
125.08 MW
PE28 (140 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
432.26 MW
PL21 (46 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
214.24 MW
PO8 (60 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
194.03 MW
PR26 (28 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
47.23 MW
PR8 (49 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
202.45 MW
RG41 (82 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
213.64 MW
RH13 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
136.86 MW
Loading map...
Showing 10 locations