Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU AXP200

291 unique locations - 4.6MW total capacity

IP2 (11 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
22.24 MW
IP20 (9 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.02 MW
IP21 (16 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.02 MW
IP22 (23 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.17 MW
IP23 (30 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.39 MW
IP24 (23 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.83 MW
IP25 (26 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.43 MW
IP26 (13 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.02 MW
IP28 (21 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
2.33 MW
IP29 (26 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.09 MW
Loading map...
Showing 10 locations