CMU AXLEH1

732 unique locations - 2.5MW total capacity

BS34 (17 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-1), 2024-25 (T-1)
122.37 MW
BS37 (37 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
276.76 MW
BS4 (23 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
201.58 MW
BS9 (24 components)
β€’ Domestic EV
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
240.30 MW
CA2 (17 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
54.07 MW
CA3 (9 components)
β€’ Domestic EV charger
β€’ Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
74.15 MW
CB2 (23 components)
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
168.70 MW
CB22 (43 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
271.35 MW
CB23 (58 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2025-26 (T-1) ...
464.27 MW
CB24 (59 components)
β€’ Domestic EV charge point
β€’ Domestic EV charger
β€’ Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
286.67 MW
Loading map...
Showing 10 locations