CMU AXLEH1

732 unique locations - 2.5MW total capacity

DY11 (20 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
235.40 MW
DY1 (16 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
125.75 MW
DT9 (11 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR ATTUNE POWER LTD Proven DSR CMU Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
76.67 MW
DT8 (5 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-4) ...
52.90 MW
DT6 (11 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
154.64 MW
DN9 (20 components)
• Domestic EV charger
• Domestic demand turn down
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
255.37 MW
DN8 (9 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
70.23 MW
DN6 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
176.91 MW
DN5 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
286.85 MW
DN3 (25 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-4), 2025-26 (T-1) ...
144.58 MW
Loading map...
Showing 10 locations